Re: squid-3 ?

From: Guido Serassio <guido.serassio@dont-contact.us>
Date: Fri, 17 Aug 2007 22:41:45 +0200

Hi Alex,

At 18.50 17/08/2007, Alex Rousskov wrote:
>On Fri, 2007-08-17 at 17:47 +0200, Guido Serassio wrote:
>
> > I propose to set as planned date for RC1 Wed 23/08.
>
>I propose to release RC1 when strtoll() bug is fixed, provided no other
>blockers are found by that time.

Now fixed.

I have just finished with success a complete build test on the
following systems:

- NetBSD 3.1
- OpenBSD 3.8
- HP Tru64 5.1
- Debian Linux 3.1
- Debian Linux 4.0
- SGI Irix 6.5.21
- Fedora Core 5
- Windows (Visual Studio 2005)
- Windows (MinGW)

It will be great if someone could run a build test on Solaris and Mac
OS/X before releasing RC1, with a major priority for Solaris.

I think that a similar complete test suite should be always executed
before a new Squid release because it warrants us about a minimal
level of code quality.

Regards

Guido

-
========================================================
Guido Serassio
Acme Consulting S.r.l. - Microsoft Certified Partner
Via Lucia Savarino, 1 10098 - Rivoli (TO) - ITALY
Tel. : +39.011.9530135 Fax. : +39.011.9781115
Email: guido.serassio@acmeconsulting.it
WWW: http://www.acmeconsulting.it/
Received on Fri Aug 17 2007 - 15:50:47 MDT

This archive was generated by hypermail pre-2.1.9 : Fri Aug 31 2007 - 12:00:05 MDT